FSUE Uralvagonzavod
We express our thanks to the team of “Turbine Blades’ Plant” OJSC for working out and manufacturing of special profile SP175GK steel 28X2M. The mentioned spesial profile passed all the tests and got successes what let our company to release reliable and high-quality technics, fulfilling state defense order.
We expect to continue our mutually advantageous collaboration and preservation of existing relations.
Alatyrsky Mechanical Plant, JSC
Alatyrsky Mechanical Plant expresses «TÑ «RM-Steel» Ltd. its gratitude and deep appreciation for the assistance and operational quality work in ensuring special profile production plant.
Thanks to timely shipment profile brake tire car retarder produced by «RM-steel» for LLC Alatyrsky Mechanical Plant was able to manufacture and supply wagon retarders for the needs of "Russian Railways" just in time.
Special thanks want to express to the Deputy Director of Sales «TÑ «RM-Steel» Ltd., Eduard E. Shugaev for an individual approach and professional solution of all tasks.
We have your company's economic stability and achieve new heights for the benefit of the Russian economy!
SPA "Putservice", Ltd.
“SPA “Putservice” Ltd. expresses thanks and sincere appreciation for assistance and high-quality foreground processing in manufacturing the section production of special purpose.
Due to well-timed shipment of section production for construction of the superstructure of the way executed by “TC “RM-steel” Ltd. in harsh deadline, “SPA “Putservice” Ltd. performed contractual commitments in time.
We express our special thanks to Shugayev Eduard Evgenievich, the head of sales department, for his critical and professional accomplishing of set tasks.
We wish your company prosperity, economic stability and achieving new business success!
Electrosila, JSC (Power Machines, OJSC)
“Electrosila” Factory, a part of holding company “Power Machines” OJSC, expresses thanks to “TC “RM-steel” Ltd. for performance of contractual commitments in supplying starter wedge billet section. That helped to complete the task of production of the parts for turbine generator of Kalininskaya Nuclear Power Plant successfully.
We expect continuation of our successful cooperation and the following developing of our business relations. Wish you and your company success and prosperity!
Vyborg Shipyard, PJSC
Vyborg Shipyard expresses gratitude to the staff of "RM-steel" for the timely execution of the order on the construction of icebreaking supply vessels Aker ARC 130A.
The entire range of bands and the bulb bar profile has been rolled in the shortest possible time and without delay set up for our shipyard.
Your company has long worked with Vyborg Shipyard and has established itself as a reliable supplier, able to fulfill orders in a professional manner.
We wish "RM-steel" LLC successful development and achieving new production success!
Plant "Red Sormovo", JSC
In pursuance of your letter ¹ TKRM/485 of 2012-09-21 we are informing you that according to Article Description ¹ 1 of 2012-05-28 by Agreement ¹ 32/03-12 of 2012-03-27 your company has manufactured and supplied us a bulb flat. We did a random test of bulb flats ¹ 10, 12, 14á, 16à with a length 11100 millimeters concerning the compliance of Paragraph 1 of Supplementary Conditions to Article Description as follows: “Bulb flat will be supplied by the 1st class of absolute consistency (GOST 21937-75), under which skewness won’t exceed 20 millimeters for stated lengths”. This increased requirement was caused by a recent start of usage of the foreign equipment on “Plant “Red Sormovo” JSC. This equipment demands the bulb flats with absolute consistency requirements greater than in GOST 21937-75.
The tests confirmed that bulb flats supplied by “RM-steel” Ltd. are absolutely equal to our supplementary requirements in absolute consistency, to be exact: the crescent of bulb flats at the length of 11100 millimeters doesn’t exceed 20 millimeters.
We want to thank you for responsible approach to business collaboration and high-quality production, what helps us to fulfill all the required tasks without delay and right on the schedule.
Baltiysky Zavod, JSC (Shipbuilding)
“Baltiysky Zavod – Shipbuilding” Ltd. expresses gratitude to “TC “RM-steel” Ltd. for professionalism and efficiency by this letter.
In a breaking point when alternative supplier hadn’t performed commitments what brought the dates of project finish under the threat of breakdown, “RM-steel” Company supplied the required quantity of bulb flat in the shortest possible time.
“Baltiysky Zavod – Shipbuilding” Ltd. wish you business success, economical and financial prosperity, consolidation of collaboration for the benefit of our companies.
We will be glad to develop our relations and are ready to work on joint projects.